home

search

Chapter 3. Chernobyl - Catastrophe

  [TOP SECRET] Report on the Progression and Dispersion of the Accident at Chernobyl Nuclear Power Plant (Revised Edition)

  Document Number: CHN-1986-04-26-TOP-SECRET

  Security Clearance: State Secret Class 1 (For Review by KGB and General Secretary Only)

  Drafting Agency: Special Commission of Inquiry of the Union of Soviet Socialist Republics

  Date: April 28, 1986 (06:00)

  1. Accident Overview and Primary Explosion (01:23:44 ~ 01:23:47)

  * Cause: Power Excursion during turbine inertial coasting (rundown) experiment at Unit 4.

  * Progression:

  * Confirmed insertion of positive reactivity due to design flaws immediately following the actuation of the Emergency Shutdown Button (AZ-5).

  * Steam pressure exceeded critical limits. Vertical displacement of the 2,000-ton Upper Biological Shield ("Elena").

  * Primary steam explosion followed by secondary hydrogen explosion.

  * Result: Complete exposure of Unit 4 core and ignition of graphite moderator.

  2. Secondary Steam Explosion and Chain Damage (01:40 ~ 02:15)

  * Situation: Confirmation of fatal chemical reaction caused by firefighting water and coolant injected during the initial response.

  * Mechanism of Occurrence:

  * Massive influx of fire suppression water into the lower Bubbler Pool.

  * Molten core fuel (Corium) penetrated the lower slab and made contact with pooled water.

  This book's true home is on another platform. Check it out there for the real experience.

  * Instantaneous vaporization caused an ultra-high-pressure steam explosion.

  * Damage Propagation:

  * Shockwaves transmitted to adjacent Units 1, 2, and 3 via shared ventilation systems and underground cable tunnels.

  * Confirmed structural failure of Unit 3 cooling systems. Forced ingress of radioactive particulates into operating units.

  3. Extent of Damage and Environmental Contamination Status

  * Core Status:

  * Unit 4: Total Loss of Core.

  * Unit 3: Severe overheating in progress due to coolant loss resulting from shockwave impact.

  * Radiation Levels:

  * Estimated to exceed 15,000 Roentgen (R)/hour within a 1km radius of the plant.

  * Initial report of 3.6 R/h was an error due to dosimeter operational limits. Actual levels are estimated at hundreds of times the lethal dose.

  * Structural Status: Total loss of facility containment. Continuous release of radioactive nuclides into the atmosphere.

  4. External Information Control and Counter-Detection Guidelines

  * Basic Policy: Regard atmospheric detection by Western nations (Scandinavia and Northern Europe) as "certain"; establish active deception protocols.

  * Counter-Logic for Nuclide Detection:

  * Upon detection of Iodine-131/Cesium-137: Disseminate disinformation attributing readings to "minor leakage from Western research reactors" or "temporary descent of existing pollutants due to unidentified meteorological phenomena."

  * Upon detection of Xenon (Xe)/Krypton (Kr): Downplay as "simple ventilation error in cooling systems."

  * Geopolitical Blockade:

  * Distort meteorological data transmissions near border regions (Poland, etc.) to confuse fallout trajectory analysis.

  * Deny IAEA access to Unit 4 citing "National Security and Military Facility" status. Submit only fabricated normal operation data for Units 1 and 2.

  * Propaganda Directives:

  * Domestic: Loop broadcasts stating "Fire extinguished, situation under total control." Prevent civil unrest.

  * International: If acknowledgement is unavoidable, limit scope to "minor turbine room fire." Categorically deny core meltdown and massive release of radioactive materials.

  5. Technical Conclusions and Strategic Urgent Measures

  * Potential Risk: Possibility of a "megaton-class tertiary steam explosion" capable of physically striking all of Europe remains if Corium contacts residual water in the Bubbler Pool.

  * Emergency Measures (Liquidators):

  * Forced deployment of personnel into high-radiation zones. Manual operation of pumps and underground concrete injection.

  * Exposure records and personal identities of deployed personnel to be permanently expunged post-operation.

  * Disposition of Unit 3:

  * Internal damage is severe, but technical failure cannot be admitted.

  * Secretly designate Unit 3 as a "Sealed High-Level Radiation Zone" while maintaining the external pretense of normal operation alongside Units 1 and 2.

  Do you think those three time line make you confuse?

  